LOD 100 to 500 Explained: Level of Development in BIM

What LOD 100, 200, 300, 350, 400 and 500 mean in BIM, how they differ, which one to specify for each project stage, and common mistakes in LOD requirements.

Level of Development (LOD) describes how far a model element has been developed — its geometry and the reliability of its information. It is defined for element types, not whole models, in the BIMForum LOD Specification.

The levels

LODMeaningTypical use
100Symbol or mass; approximate area/volumeConcept, feasibility
200Generic element with approximate size, shape and locationSchematic design
300Specific element with accurate size, shape, location and orientationDesign development, coordination, tender drawings
350LOD 300 plus interfaces with other systems (supports, connections, clearances)Detailed coordination, clash resolution
400Fabrication-ready detail and assembly informationShop drawings, fabrication
500Field-verified as-built representationHandover, facility management

LOD vs LOD vs LOI

“Level of Detail” refers to graphics only; “Level of Development” includes reliability of information. Under ISO 19650, many teams instead specify Level of Information Need (geometry, alphanumeric data and documentation separately).

Choosing the right level

  • Don’t ask for LOD 400 everywhere — it multiplies effort. Specify by element and stage.
  • MEP coordination usually needs LOD 350 for services and the structure they hang from.
  • LOD 500 is only meaningful if someone actually verifies the field condition.

Common mistakes

Treating LOD as a model-wide number, not linking it to a model use, and forgetting to state who is responsible for each element. A clear LOD matrix in the BIM Execution Plan avoids all three.

Need a firm number for your project?