Uses the common dry-volume method: dry volume = wet volume × 1.54, split by the nominal mix ratio. Cement at 1,440 kg/m³ (one 50 kg bag ≈ 0.0347 m³). Design mixes (as used for M25 and above on engineered sites) will differ.
Send drawings or a sketch — we reply with scope, timeline and a fixed quote.